FOSROC – SINCLAIR WHARF BELFAST

 

THE PROJECT
Belfast Harbour Commissioners put a project out to tender for the removal and replacement of an existing fibre reinforced floor slab within an existing warehouse facility at Sinclair Wharf, Belfast Harbour Estate. The works included the creation of additional grain bay walls within the 12,700 sq ft warehouse, which was being used as a flat grain store. The work was to be delivered on a phased basis, with the remaining space beyond a phase zone to remain operational throughout the construction. For one of these phases, main contractor Dowds Group employed the services of specialist contractor MR Concrete to apply suitable products to harden and dust-proof the new concrete floor. As a reputable manufacturer of specialist building materials, Fosroc was selected to provide a durable and cost-effective solution.

THE SOLUTION
The product needed to provide a sufficiently hardened blemish-free surface capable of withstanding a high level of physical abrasion from heavy steel loading equipment. Fosroc’s Nitoflor Hardtop S was used for the surface hardening aspect. The Nitoflor Hardtop S compound is a ready-to-use quality controlled, factory blended powder that consists of special hard-wearing aggregates (selected for their physical properties of abrasion and wear resistance), Portland cement and additives – which improves workability. This combination produces a material that is easy to trowel into the surface of fresh concrete. When cured, the product provides a dense, non-porous surface which is extremely hard wearing and abrasion resistant. Curing membrane ‘Fosroc Cure B’ was then spray applied to retain moisture to provide a more durable and higher strength concrete.

THE BENEFITS
The monolithic cure of Nitoflor Hardtop S ensured that problems normally associated with thin granolithic screeds such as curling, shrinkage, cracking etc were completely overcome. Its workability characteristics meant that it was straightforward to apply for the contractor, and the non-metallic aggregate avoids any future rust related issues. Cure B controlled moisture loss to improve the surface quality, reduce permeability and minimise potential for cracking and shrinkage. Fast and easy spray application reduced labour, and its water-based, non-toxic and non-flammable properties make it safer and more environmentally friendly. At completion, the client and contractor’s expectations were met, with the finished application resulting in a smooth non-slip surface, dust-free and hard-wearing floor surface that was safe, fit for purpose and long-lasting, with minimised future maintenance.

 

www.fosroc.com

_____________________________________________________

Michael McDonnell Managing Editor of Irish Construction Industry Magazine & Plan Magazine

Email: michael@irishconstruction.com      WWW.MCDMEDIA.IE 

 

Continue Reading

  • THIRD INTAKE OF FEMALE GRADUATES AT KIRBY

    THIRD INTAKE OF FEMALE GRADUATES AT KIRBY Kirby invests in diversity and inclusion with its third intake of female engineering graduates to the Kirby bursary programme As part of its ongoing commitment to and investment in diversity and inclusion, Kirby Group Engineering has announced the five winners of its third-level bursary programme for the 2024/25…

  • SMET ANNOUNCES ITS RECERTIFICATION TO BES 6001

    SMET ANNOUNCES ITS RECERTIFICATION TO BES 6001 Construction companies are recognising a need to prove their buildings are built with sustainability in mind, and one element of this is in the responsible sourcing of products used in construction. To this end, SMET was recently recertified to BES 6001 by BSI, with a rating of Good….

  • | |

    SISK SORENSEN JV DOUBLES UP FOR €150M ADARE BYPASS AHEAD OF RYDER CUP 2027

    SISK SORENSEN JV DOUBLES UP FOR €150M ADARE BYPASS AHEAD OF RYDER CUP 2027 Minister for Transport visits site and looks forward to completion ahead of Ryder Cup 2027 Sisk Sorensen Joint Venture and Limerick City and County Council is pleased to announce the signing of the Adare Bypass Design and Construction Contract. The contract…

  • |

    2025 ACEI ENGINEERING EXCELLENCE AWARD WINNERS

    2025 ACEI ENGINEERING EXCELLENCE AWARD WINNERS The Association of Consulting Engineers of Ireland (ACEI) Engineering Excellence Awards were established in 1970 to promote and stimulate project excellence and innovation in member firms. These prestigious annual awards offer consulting engineers an opportunity to showcase their work to a wider audience, and the ACEI congratulates all the…

  • MMC IRELAND INAUGURAL CONFERENCE A SELL OUT SUCCESS

      MMC IRELAND INAUGURAL CONFERENCE A SELL OUT SUCCESS Over 250 delegates from across the offsite sector gathered at Croke Park, Dublin for the much-anticipated MMC Ireland National Conference. The inaugural event, hosted in partnership with MMC Ireland and Explore Offsite, was hailed a complete success, with exhibition space and delegate tickets selling out. Showcasing…