SISK RAIL SECURES TICKET ON £225M NETWORK RAIL FRAMEWORK

Sisk Rail has secured a place on a £225M framework for Network Rail (LOT 3 Buildings Western framework), part of the wider £750M Network Rail Reactive and Minor Works (RMW) framework covering buildings and civils works across five years.

The scope of works includes Planned Maintenance, Unplanned Maintenance, Cyclical Maintenance, Projects Works and Emergency Works for an estimated 250 buildings and stations along the route.

As part of these works, Sisk Rail will maintain a presence in all stations across the Western route including, Reading, Bristol Temple Meads, Exeter and Plymouth. We will also be supporting Network Rail with minor works packages (small value projects) that enable the ongoing delivery of a safe railway, putting passengers first.

Sisk Rail will employ over 150 people predominantly based along the route throughout the delivery of the five-year framework and will provide 24/7 reactive call out capability across the route. This will grow as we further invest in apprentices across Western communities to support the delivery of these works. Sisk Rail plans to hire 28 apprentices across the duration of the works and these will learn skills from our existing team who have in some cases over 30 years’ experience working along this route.

Network Rail owns, operates, maintains, and develops the railway infrastructure in England, Scotland, and Wales; including being responsible for 20,000 miles of track, 30,000 bridges, tunnels and viaducts.

Carl Hendry, Sisk Rail said: “We are thrilled and deeply honoured that Network Rail have chosen us to deliver as part of this important reactive and minor works framework. This is a testament to the trust they place in our expertise, our values and our people. At Sisk Rail, we are driven by a passion for delivering excellence, and our team is already preparing to mobilise alongside the 180 SMEs that form the backbone of our collaborative approach.
Playing our part to ensure that 58.6m passenger journeys can continue in the western region each year with the least disruption possible is no small task. Together, we are committed to ensuring a seamless start and a shared vision for achieving outstanding results throughout the framework’s delivery.”


johnsiskandson.com

_____________________________________________________

Michael McDonnell Managing Editor of Irish Construction Industry Magazine & Plan Magazine

Email: michael@irishconstruction.com      WWW.MCDMEDIA.IE 

 

Continue Reading

  • |

    Purcell Construction appointed to €173m Parnell Square Cultural Quarter project

    Purcell Construction appointed to €173m Parnell Square Cultural Quarter project Dublin City Council has appointed Purcell Construction Limited as main contractor for Phase 1 of the Parnell Square Cultural Quarter – New City Library project, with construction due to commence in the coming weeks. With an estimated all-in project cost of €173.2 million, the development…

  • |

    Why Integrated heating Design is Becoming Critical for new Homes

    Why Integrated Heating Design is Becoming Critical for New Homes As Ireland’s residential construction sector continues to deliver homes to increasingly demanding energy performance standards, heating system design can no longer be treated as a standalone element of a project. Instead, it is becoming an integral part of the overall building design process, influencing everything…

  • Sisk Group reports 27.7% increase in profit before tax to €74.2m

    Sisk Group reports 27.7% increase in profit before tax to €74.2m Sicon Limited, the parent company of John Sisk & Son’s construction and related businesses in Ireland, the UK and Europe, has reported a strong financial performance for the year ended 31 December 2025, with profit before tax increasing by 27.7% to €74.2m. Operating profit…

  • Engineering shortage threatens housing and infrastructure delivery, Engineers Ireland warns

    Engineering shortage threatens housing and infrastructure delivery, Engineers Ireland warns A shortage of engineers and delays in delivering critical infrastructure are putting Ireland’s housing targets, transition to low-carbon energy and economic competitiveness at risk, Engineers Ireland has warned. In its Pre-Budget 2027 Submission, the professional body, which represents more than 30,000 members, warns that Ireland…

  • |

    New R290 Heat Pump from Pipelife

    New R290 Heat Pump from Pipelife Pipelife launches indoor R290 heat pump designed for Irish apartments Pipelife Ireland has launched a new indoor monoblock heat pump designed specifically for the demands of Irish apartment construction. The system has been developed from the ground up and rigorously tested to reflect real-world building conditions, rather than relying…