Cairn Homes has lodged planning documentation with An Bord Pleanála signalling its intention to build 611 apartments and three townhouses on the site it purchased from RTÉ in Donnybrook for €107.5 million over two years ago. The number of apartments planned is 111 more than the original 500 Cairn initially indicated it would construct on the 8.64 acre (3.49 hectare) site.
In a notice published by An Bord Pleanála, the Cairn plans for the site is described as comprising “611 apartments, three town houses, two cafes, one childcare facility, demolition of one existing sports and social club, change of use of Mount Errol from existing office use to private residents member’s club and gym and associated site works”.

Before the 2017 deal, Cairn Homes chief executive Michael Stanley stated: “If an opportunity like the RTÉ site comes along, it’s a once-in-a-lifetime chance to acquire a site of that quality.”
The planning documentation lodged by the building firm starts a nine-week long pre-planning consultation with An Bord Pleanála. The consultation will involve Dublin City Council planners and at the end of the consultation, An Bord Pleanála will provide an opinion on the development. It is then open to Cairn Homes to take into account of the views expressed by An Bord Pleanála before lodging an application direct to An Bord Pleanála under Government fast-track planning rules.

Denise Maguire        
Editor  of  Irish Construction Industry Magazine

Email: denise@mcdmedia.ie

Continue Reading

  • |

    Purcell Construction appointed to €173m Parnell Square Cultural Quarter project

    Purcell Construction appointed to €173m Parnell Square Cultural Quarter project Dublin City Council has appointed Purcell Construction Limited as main contractor for Phase 1 of the Parnell Square Cultural Quarter – New City Library project, with construction due to commence in the coming weeks. With an estimated all-in project cost of €173.2 million, the development…

  • |

    Why Integrated heating Design is Becoming Critical for new Homes

    Why Integrated Heating Design is Becoming Critical for New Homes As Ireland’s residential construction sector continues to deliver homes to increasingly demanding energy performance standards, heating system design can no longer be treated as a standalone element of a project. Instead, it is becoming an integral part of the overall building design process, influencing everything…

  • Sisk Group reports 27.7% increase in profit before tax to €74.2m

    Sisk Group reports 27.7% increase in profit before tax to €74.2m Sicon Limited, the parent company of John Sisk & Son’s construction and related businesses in Ireland, the UK and Europe, has reported a strong financial performance for the year ended 31 December 2025, with profit before tax increasing by 27.7% to €74.2m. Operating profit…

  • Engineering shortage threatens housing and infrastructure delivery, Engineers Ireland warns

    Engineering shortage threatens housing and infrastructure delivery, Engineers Ireland warns A shortage of engineers and delays in delivering critical infrastructure are putting Ireland’s housing targets, transition to low-carbon energy and economic competitiveness at risk, Engineers Ireland has warned. In its Pre-Budget 2027 Submission, the professional body, which represents more than 30,000 members, warns that Ireland…

  • |

    New R290 Heat Pump from Pipelife

    New R290 Heat Pump from Pipelife Pipelife launches indoor R290 heat pump designed for Irish apartments Pipelife Ireland has launched a new indoor monoblock heat pump designed specifically for the demands of Irish apartment construction. The system has been developed from the ground up and rigorously tested to reflect real-world building conditions, rather than relying…